Jobs at Muswellbrook Solar Farm & Battery Project

Chandler Macleod is recruiting local people to help build the Muswellbrook Solar Farm in the Upper Hunter, partnering with Bouygues Construction Australia and Equans Solar & Storage.

View Current Jobs

About Muswellbrook Solar Farm & Battery Project

The Muswellbrook Solar Farm & Battery Project is a new renewable energy project in the Upper Hunter, around 10min from Muswellbrook and 35min from Singleton.


Chandler Macleod is partnering with Bouygues Construction Australia and Equans Solar & Storage to recruit the construction workforce, with a focus on hiring people who live in the region.


If you live in or around Muswellbrook, Scone, Denman, Singleton or Aberdeen, this is a chance to work on a major project close to home.

Roles We’re Recruiting For

  • Electricians 
  • Labourers 
  • Telehandler operators 
  • Truck drivers 
  • Stores people 
  • Leading hands
  • Plant operators (including excavator operators, skid steer operators, dump truck operators and front end loader operators)

Located approximately 2.5 km east of Muswellbrook in NSW’s Upper Hunter region, the Muswellbrook Solar Farm and Battery Project is a major renewable energy development within the Hunter-Central Coast Renewable Energy Zone. The project combines a 135 MW solar farm with a 100 MW Battery Energy Storage System (BESS) and will feature approximately 300,000 solar panels across a 482-hectare site. Once operational, the project is expected to generate enough renewable electricity to power approximately 52,000 homes.

Your Skills Already Fit

You don’t need a background in solar. If you’ve worked with hand tools, operated civil equipment, held an electrical trade or done physical outdoor work, your experience counts.


We especially encourage applications from:


  • Workers moving on from mining roles in the region
  • Women looking to start or grow a career in construction
  • Aboriginal and Torres Strait Islander people
View Current Jobs

Current opportunities at Muswellbrook Solar Farm

If no roles are shown below, we’re not in an active recruitment phase. Check back regularly and sign up for job alerts to hear about new roles as they become available.

list, view, menu, category
grid, view, menu, category grid, view, menu, category
0 jobs matched your search

What Candidates Say About Us

FAQs

  • How do I apply for jobs at Muswellbrook Solar Farm?

    Browse the current roles above and apply online. Our team will be in touch by phone or email about the next steps.

  • Do I need solar farm experience?

    No. We’re looking for people with experience in manual work, using hand tools, operating civil equipment or electrical trades. Training and site induction will be provided.

  • What tickets or licences do I need?

    Most construction roles need a General Construction Induction card (White Card). Some roles need specific licences, such as a telehandler licence or a heavy vehicle licence. Each job ad lists what’s required.

  • I’m coming from a mining job. Can I apply?

    Yes. Many mining skills transfer directly to solar construction, including plant operation, working to strict safety standards and working outdoors on large sites.

  • Where is the solar farm located?

    In the Muswellbrook area of the Upper Hunter, NSW. We’re focused on hiring people from the surrounding communities, including Scone, Denman, Singleton and Aberdeen.

  • I’ve applied but haven’t heard back. What happens next?

    Our consultants review every application. If your skills match a current role, we’ll contact you by phone or email. You don’t need to call us to follow up.